BAM Weekly Working Group June 12th, 2023: Difference between revisions
Jump to navigation
Jump to search
(Created page with "=== Attendees === * Dave Dornlas * Jim Moss * Tim Wilkinson * Mathison Ott * Chris Adams === Notes by === * Tim Wilkinson === Major Discussions Topics === * Black Mountain ** Jim continues to work on debugging the problems at Black Mountain. ** Discussion that at some point it might be useful to take a bunch of equipment out into the desert to do some non-interference, distance testing between nodes (Mathison has always wanted to do this). * Jim ** Giving a presenta...") |
|||
Line 22: | Line 22: | ||
* Winlink |
* Winlink |
||
** Dave is working on a Winlink system, but progress and debugging on the non-Window software is slow going. |
** Dave is working on a Winlink system, but progress and debugging on the non-Window software is slow going. |
||
+ | * San Bruno Mtn |
||
+ | ** Tim plans to go up on Tuesday to reroute all the cabling into the shack to a more preferred entry point. He'll also cut and re-terminate as the cables are far too long. |
Latest revision as of 16:41, 17 June 2023
Attendees
- Dave Dornlas
- Jim Moss
- Tim Wilkinson
- Mathison Ott
- Chris Adams
Notes by
- Tim Wilkinson
Major Discussions Topics
- Black Mountain
- Jim continues to work on debugging the problems at Black Mountain.
- Discussion that at some point it might be useful to take a bunch of equipment out into the desert to do some non-interference, distance testing between nodes (Mathison has always wanted to do this).
- Jim
- Giving a presentation on AREDN in the South Bay on Tuesday
- Tim will help him configure the new switch for Black next week
- Invited to Allison to see what we can/cannot arrange there
- Winlink
- Dave is working on a Winlink system, but progress and debugging on the non-Window software is slow going.
- San Bruno Mtn
- Tim plans to go up on Tuesday to reroute all the cabling into the shack to a more preferred entry point. He'll also cut and re-terminate as the cables are far too long.