Hurricane Electric FMT2: Difference between revisions

From Bay Area Mesh
Jump to navigation Jump to search
No edit summary
Line 73: Line 73:
 
* Add 10 GHz Mimosa dish on roof, pointing at [[Fire Station 8]]
 
* Add 10 GHz Mimosa dish on roof, pointing at [[Fire Station 8]]
 
* Add new PDU
 
* Add new PDU
* Move fiber to media converter.
+
* Move HE fiber to Media Converter.
 
* Switch 1G optics for 10G optics on Router.
 
* Switch 1G optics for 10G optics on Router.
 
* Attach FCIX fiber.
 
* Attach FCIX fiber.
Line 83: Line 83:
 
* Installed Router.
 
* Installed Router.
 
* Installed Proxmox Server.
 
* Installed Proxmox Server.
* Installed media converter ethernet-to-sfp box.
+
* Installed [https://www.trendnet.com/products/fiber-converter/gigabit-poe-pd-media-converter-TFC-PGSFP SFP Media Converter]
 
* Attached HE fiber to Router.
 
* Attached HE fiber to Router.
   

Revision as of 22:23, 20 December 2023

he.net

Hurricane Electric is located at 48233 Warm Springs Blvd, Fremont, CA 94539 (map).

Nodes

KN6PLV-HE-VERA

  • Radio: VM
  • Antenna: n/a
  • Location: 37.4718, -121.9201
  • Altitude: n/a
  • Bearing: n/a
  • Notes:

Backbone

Dish to Fire Station 8

  • Radio: Mimosa B11
  • Link Name: fs8-to-hurricane
  • Frequency: 10.010 GHz & 10.030 GHz
  • Bandwidth: 2x 20 MHz
  • Mode: CPE
  • Antenna: 34 dBi dish - Jirous JRMC-680-10/11
  • Location: 37.4718, -121.9201
  • Altitude: -
  • Bearing: -

Colocation

Cabinet

  • Cabinet: fmt2.1500.06.51
  • CE Number: ce4794
  • Power Type: 20A, 208V, single-phase

Router

  • Manufacturer: Mikrotik
  • Model: RB5009UPr+S+

Server

  • Manufacturer: Intel
  • Model: NUC11ATKC4 16GB+512GB
  • OS: Proxmox

Transit and Peer Information

Hurricane Electric

This site provides a peering point between the Backbone and the more general Internet.

  • IPv4 Peer
    • BAM: 65.49.70.251/31
    • HE: 65.49.70.250/31
    • Network: 65.49.70.250/31
  • IPv6 Peer
    • BAM: 2001:470:253::2/126
    • HE: 2001:470:253::1/126
    • Network: 2001:470:253::1/126

Fremont Cabal Internet Exchange (fcix.net)

Pending

Site Details

Hurricane Electric Fremont 2 is a 208,000 square foot colocation facility located in the heart of Silicon Valley with easy access from two major freeways (880, 680). Three international airports (SJC, OAK, SFO) are a short distance away. Their Fremont 1 Colocation Facility is located 1.5 miles north (edited from their website).

More information can be found on their website.

Future Plans

  • Add 10 GHz Mimosa dish on roof, pointing at Fire Station 8
  • Add new PDU
  • Move HE fiber to Media Converter.
  • Switch 1G optics for 10G optics on Router.
  • Attach FCIX fiber.

Completed Work

December 2023

  • Installed Router.
  • Installed Proxmox Server.
  • Installed SFP Media Converter
  • Attached HE fiber to Router.

Contacts

Site Admin

  • Tim Wilkinson - KN6PLV - tim@bayareamesh.us

Mesh Admin

  • Tim Wilkinson - KN6PLV - tim@bayareamesh.us