(Created page with "=== Attendees === * Dave Dornlas * Chris Adams * Tim Wilkinson === Notes by === * Tim Wilkinson === Major Discussions Topics[edit | edit source] === * High Sites ** San Bruno Mountain *** Submitting plan for new hardware mounting ** Woflback *** Tests from ORCA and CCCC successful. San Pedro is the last. ** Sunol Ridge *** Livermore have a repeater here. Tim is visiting in early November * Alameda OES ** Chris talked about possible paths available for the OES projec...") |
|||
Line 9: | Line 9: | ||
* Tim Wilkinson |
* Tim Wilkinson |
||
− | === Major Discussions Topics |
+ | === Major Discussions Topics === |
* High Sites |
* High Sites |
Latest revision as of 14:40, 24 October 2022
Attendees
- Dave Dornlas
- Chris Adams
- Tim Wilkinson
Notes by
- Tim Wilkinson
Major Discussions Topics
- High Sites
- San Bruno Mountain
- Submitting plan for new hardware mounting
- Woflback
- Tests from ORCA and CCCC successful. San Pedro is the last.
- Sunol Ridge
- Livermore have a repeater here. Tim is visiting in early November
- San Bruno Mountain
- Alameda OES
- Chris talked about possible paths available for the OES project with Alameda County
- Possibilities of a test link (2 sites)
- Las Positas College
- Dave discussed how we might get access, and creating some sort of standard letter to send to possible sites as way of introduction.