Hurricane Electric FMT2: Difference between revisions

From Bay Area Mesh
Jump to navigation Jump to search
Line 56: Line 56:
   
 
=== Transit Information ===
 
=== Transit Information ===
 
==== Hurricane Electric ====
 
 
This site provides a peering point between the Backbone and the more general Internet.
 
This site provides a peering point between the Backbone and the more general Internet.
 
* '''IPv4 Peer'''
 
* '''IPv4 Peer'''

Revision as of 18:29, 27 December 2023

Hurricane Electric Colocation Facility Fremont2.jpg

he.net

Hurricane Electric is located at 48233 Warm Springs Blvd, Fremont, CA 94539 (map).

Part of the Bay Area Backbone.

Nodes

KN6PLV-HE-VERA

  • Radio: VM
  • Antenna: n/a
  • Location: 37.4718, -121.9201
  • Altitude: n/a
  • Bearing: n/a
  • Notes:

Backbone

Dish to Fire Station 8

  • Radio: Mimosa B11
  • Link Name: fs8-to-hurricane
  • Frequency: 10.010 GHz & 10.030 GHz
  • Bandwidth: 2x 20 MHz
  • Mode: CPE
  • Antenna: 34 dBi dish - Jirous JRMC-680-10/11
  • Location: 37.4718, -121.9201
  • Altitude: -
  • Bearing: -

Site Details

Hurricane Electric Fremont 2 is a 208,000 square foot colocation facility located in the heart of Silicon Valley with easy access from two major freeways (880, 680). Three international airports (SJC, OAK, SFO) are a short distance away. Their Fremont 1 Colocation Facility is located 1.5 miles north (edited from their website).

More information can be found on their website.

Colocation

Cabinet

  • Cabinet: fmt2.1500.06.51
  • CE Number: ce4794
  • Power Type: 20A, 208V, single-phase

Router

  • Manufacturer: Mikrotik
  • Model: RB5009UPr+S+

Switch

Server

  • Manufacturer: Intel
  • Model: NUC11ATKC4 16GB+512GB
  • OS: Proxmox

Transit Information

This site provides a peering point between the Backbone and the more general Internet.

  • IPv4 Peer
    • BAM: 65.49.70.251/31
    • HE: 65.49.70.250/31
    • Network: 65.49.70.250/31
  • IPv6 Peer
    • BAM: 2001:470:253::2/126
    • HE: 2001:470:253::1/126
    • Network: 2001:470:253::1/126

Future Plans

Completed Work

December 2023 (2)

  • Installed new PDU
  • Removed Media Converter
  • Installed Mikrotik CRS309-1G-8S+IN Switch to support multiple incoming fibers
  • Configured BGP
  • Configured OSPF
  • Configured Wireguard to Oxford as temporary link until dish installed
  • Switched FCIX optics to 10G
  • Installed HE fiber in 1G optics on switch

December 2023

  • Installed Router
  • Installed Proxmox Server
  • Installed SFP Media Converter
  • Attached HE fiber to Router

Contacts

Site Admin

  • Tim Wilkinson - KN6PLV - tim@bayareamesh.us

Mesh Admin

  • Tim Wilkinson - KN6PLV - tim@bayareamesh.us