(Created page with "=== Attendees === * Dave Dornlas * Chris Adams * Tim Wilkinson === Notes by === * Tim Wilkinson === Major Discussions Topics[edit | edit source] === * High Sites ** San Bruno Mountain *** Submitting plan for new hardware mounting ** Woflback *** Tests from ORCA and CCCC successful. San Pedro is the last. ** Sunol Ridge *** Livermore have a repeater here. Tim is visiting in early November * Alameda OES ** Chris talked about possible paths available for the OES projec...")
 
 
Line 9: Line 9:
 
* Tim Wilkinson
 
* Tim Wilkinson
   
=== Major Discussions Topics[edit | edit source] ===
+
=== Major Discussions Topics ===
   
 
* High Sites
 
* High Sites

Latest revision as of 14:40, 24 October 2022

Attendees

  • Dave Dornlas
  • Chris Adams
  • Tim Wilkinson

Notes by

  • Tim Wilkinson

Major Discussions Topics

  • High Sites
    • San Bruno Mountain
      • Submitting plan for new hardware mounting
    • Woflback
      • Tests from ORCA and CCCC successful. San Pedro is the last.
    • Sunol Ridge
      • Livermore have a repeater here. Tim is visiting in early November
  • Alameda OES
    • Chris talked about possible paths available for the OES project with Alameda County
    • Possibilities of a test link (2 sites)
  • Las Positas College
    • Dave discussed how we might get access, and creating some sort of standard letter to send to possible sites as way of introduction.