Hurricane Electric FMT2: Difference between revisions
Jump to navigation
Jump to search
Line 259: | Line 259: | ||
=== Future Plans === |
=== Future Plans === |
||
+ | None |
||
+ | |||
⚫ | |||
+ | |||
+ | ==== April 2024 ==== |
||
* Re-adjust antenna once Mount Allison dish is installed. |
* Re-adjust antenna once Mount Allison dish is installed. |
||
* Replace missing radio bolt. |
* Replace missing radio bolt. |
||
− | |||
⚫ | |||
==== March 2024 / 2 ==== |
==== March 2024 / 2 ==== |
Latest revision as of 20:30, 25 October 2024
Hurricane Electric is located at 48233 Warm Springs Blvd, Fremont, CA 94539 (map)(photos).
Part of the Bay Area Backbone.
Nodes
KN6PLV-HE-VERA
- Radio: Proxmox
- Antenna: -
- Location: 37.4718, -121.9201
- Altitude: -
- Bearing: -
- Notes: Node is virtualized
KN6PLV-BAM-SUPERNODE
- Radio: Proxmox
- Antenna: -
- Location: 37.4718, -121.9201
- Altitude: -
- Bearing: -
- Notes: Node is virtualized
Backbone
Dish to Mount Allison
- Radio: Mimosa B11
- Link Name: hurricane-to-allison
- Frequency: 10.010 GHz & 10.030 GHz
- Bandwidth: 2x 20 MHz
- Mode: AP
- Antenna: 34 dBi dish - Jirous JRMC-680-10/11
- Location: 37.4718, -121.9201
- Altitude: 14m
- Bearing: 53°
Site Details
Hurricane Electric Fremont 2 is a 208,000 square foot colocation facility located in the heart of Silicon Valley with easy access from two major freeways (880, 680). Three international airports (SJC, OAK, SFO) are a short distance away. Their Fremont 1 Colocation Facility is located 1.5 miles north (edited from their website).
More information can be found on their website.
Colocation
Cabinet
- Cabinet: fmt2.1500.06.51
- CE Number: ce4794
- Power Type: 20A, 208V, single-phase
Router
- Manufacturer: Mikrotik
- Model: RB5009UPr+S+
Switch
- Manufacturer: Mikrotik
- Model: CRS309-1G-8S+IN
Server
- Manufacturer: Intel
- Model: NUC11ATKC4 16GB+512GB
- OS: Proxmox
Port Configurations
VLAN | Description |
---|---|
2 | AREDN DtD |
10 | AREDN LAN |
11 | AREDN WAN |
408 | bam-uisp @ 206.197.44.8 |
409 | websites proxy @ 206.197.44.9 |
410 | aredn-supernode @ 206.197.44.10 |
1101 | xlink & OSPF networks |
4001 | Switch management |
4002 | Switch sfp+2 port |
4003 | Switch sfp+3 port |
4004 | Switch sfp+4 port |
4005 | FREMIX (switch sfp+5 port) |
4006 | ARIX (switch sfp+6 port) |
4007 | FCIX (switch sfp+7 port) |
4008 | Hurricane Electric (switch sfp+8 port) |
Port | Description | VLANs | PoE | Notes |
---|---|---|---|---|
sfp+ | to Switch | 4001,4002,4003,4004,4005,4006,4007,4008 | - | 10G DAC connection to switch |
2.5g | no | |||
2 | no | |||
3 | no | |||
4 | no | |||
5 | no | |||
6 | Proxmox Server | (U), 408, 409, 410,1101 | no | |
7 | KVM | 48v | ||
8 | 10 GHz dish | 1101 | 48v |
Port | Description | VLANs | PoE | Notes |
---|---|---|---|---|
sfp+1 | to Router | 4001,4002,4003,4004,4005,4006,4007,4008 | - | 10G DAC connection to router |
sfp+2 | (4002) | - | ||
sfp+3 | (4003) | - | ||
sfp+4 | (4004) | - | ||
sfp+5 | FREMIX | (4005) | - | 10G |
sfp+6 | ARIX | (4006) | - | 1G |
sfp+7 | FCIX | (4007) | - | 10G |
sfp+8 | Hurricane Electric | (4008) | - | 1G: Transit provider |
eth | - |
Transit Information
This site provides a peering point between the Backbone and the more general Internet.
- IPv4 Peer
- BAM: 65.49.70.251/31
- HE: 65.49.70.250/31
- Network: 65.49.70.250/31
- IPv6 Peer
- BAM: 2001:470:253::2/126
HE: 2001:470:253::1/126
- Network: 2001:470:253::1/126
Future Plans
None
Completed Work
April 2024
- Re-adjust antenna once Mount Allison dish is installed.
- Replace missing radio bolt.
March 2024 / 2
- Adjust dish positioning to improve SNR.
March 2024 / 1
- Replace Mimosa power solution with injector + power controller (ezOutlet5)
- The B11 radio required more power (just occasionally) than the router could provide, causing resets.
February 2024
- Adjusted and raised dish to try to get connection to Fire Station 8, but failed. Looks like the landfill is just too high now.
- Repointed dish at Mount Allison for alternate path.
- Observer 10GHz beacon at Mt Allison on radio's spectrum analyzer
January 2024 / 3
- Added 10 GHz Mimosa dish on roof, pointing at Fire Station 8
- Connection could not be made. The other end is not yet aligned. It's also possible the link is non-viable as the "tip" near the Bay may be too high now and obstructing.
January 2024 / 2
- Installed KVM
- Labelled newly installed cables
- Terminated and installed roof ethernet
- Cable has been pulled to the roof by HE.
January 2024 / 1
- Installed 1G and 10G optics for later use
December 2023 / 3
- Setup peering with ARIX on 1G optics
December 2023 / 2
- Installed new PDU
- Removed Media Converter
- Installed Mikrotik CRS309-1G-8S+IN Switch to support multiple incoming fibers
- Configured BGP
- Configured OSPF
- Configured Wireguard to Oxford as temporary link until dish installed
- Switched FCIX optics to 10G
- Installed HE fiber in 1G optics on switch
December 2023 / 1
- Installed Router
- Installed Proxmox Server
- Installed SFP Media Converter
- Attached HE fiber to Router
Contacts
Site Admin
- Tim Wilkinson - KN6PLV - tim@bayareamesh.us
Mesh Admin
- Tim Wilkinson - KN6PLV - tim@bayareamesh.us