Part of the [[Bay Area Backbone]].
 
Part of the [[Bay Area Backbone]].
   
Up-to-date information about this site is documented in NetBox - https://netbox.bayareabackbone.com/dcim/sites/1/
+
See https://netbox.bayareabackbone.com/dcim/sites/1/
   
 
== Nodes ==
 
== Nodes ==

Revision as of 14:16, 7 December 2024

Hurricane Electric Colocation Facility Fremont2.jpg

he.net

Hurricane Electric is located at 48233 Warm Springs Blvd, Fremont, CA 94539 (map)(photos).

Part of the Bay Area Backbone.

See https://netbox.bayareabackbone.com/dcim/sites/1/

Nodes

Hurricane Rack.jpg

KN6PLV-HE-VERA

  • Radio: Proxmox
  • Antenna: -
  • Location: 37.4718, -121.9201
  • Altitude: -
  • Bearing: -
  • Notes: Node is virtualized

KN6PLV-BAM-SUPERNODE

  • Radio: Proxmox
  • Antenna: -
  • Location: 37.4718, -121.9201
  • Altitude: -
  • Bearing: -
  • Notes: Node is virtualized

Backbone

To Mnt Allison.jpg

Dish to Mount Allison

  • Radio: Mimosa B11
  • Link Name: hurricane-to-allison
  • Frequency: 10.010 GHz & 10.030 GHz
  • Bandwidth: 2x 20 MHz
  • Mode: AP
  • Antenna: 34 dBi dish - Jirous JRMC-680-10/11
  • Location: 37.4718, -121.9201
  • Altitude: 14m
  • Bearing: 53°

Site Details

Hurricane Electric Fremont 2 is a 208,000 square foot colocation facility located in the heart of Silicon Valley with easy access from two major freeways (880, 680). Three international airports (SJC, OAK, SFO) are a short distance away. Their Fremont 1 Colocation Facility is located 1.5 miles north (edited from their website).

More information can be found on their website.

Colocation

Cabinet

  • Cabinet: fmt2.1500.06.51
  • CE Number: ce4794
  • Power Type: 20A, 208V, single-phase

Router

  • Manufacturer: Mikrotik
  • Model: RB5009UPr+S+

Switch

Server

  • Manufacturer: Intel
  • Model: NUC11ATKC4 16GB+512GB
  • OS: Proxmox

Port Configurations

VLANs
VLAN Description
2 AREDN DtD
10 AREDN LAN
11 AREDN WAN
408 bam-uisp @ 206.197.44.8
409 websites proxy @ 206.197.44.9
410 aredn-supernode @ 206.197.44.10
1101 xlink & OSPF networks
4001 Switch management
4002 Switch sfp+2 port
4003 Switch sfp+3 port
4004 Switch sfp+4 port
4005 FREMIX (switch sfp+5 port)
4006 ARIX (switch sfp+6 port)
4007 FCIX (switch sfp+7 port)
4008 Hurricane Electric (switch sfp+8 port)
Router
Port Description VLANs PoE Notes
sfp+ to Switch 4001,4002,4003,4004,4005,4006,4007,4008 - 10G DAC connection to switch
2.5g no
2 no
3 no
4 no
5 no
6 Proxmox Server (U), 408, 409, 410,1101 no
7 KVM 48v
8 10 GHz dish 1101 48v
Switch
Port Description VLANs PoE Notes
sfp+1 to Router 4001,4002,4003,4004,4005,4006,4007,4008 - 10G DAC connection to router
sfp+2 (4002) -
sfp+3 (4003) -
sfp+4 (4004) -
sfp+5 FREMIX (4005) - 10G
sfp+6 ARIX (4006) - 1G
sfp+7 FCIX (4007) - 10G
sfp+8 Hurricane Electric (4008) - 1G: Transit provider
eth -
Transit Information

This site provides a peering point between the Backbone and the more general Internet.

  • IPv4 Peer
    • BAM: 65.49.70.251/31
    • HE: 65.49.70.250/31
    • Network: 65.49.70.250/31
  • IPv6 Peer
    • BAM: 2001:470:253::2/126

HE: 2001:470:253::1/126

    • Network: 2001:470:253::1/126

Future Plans

None

Completed Work

April 2024

  • Re-adjust antenna once Mount Allison dish is installed.
  • Replace missing radio bolt.

March 2024 / 2

  • Adjust dish positioning to improve SNR.

March 2024 / 1

  • Replace Mimosa power solution with injector + power controller (ezOutlet5)
    • The B11 radio required more power (just occasionally) than the router could provide, causing resets.
February 2024
  • Adjusted and raised dish to try to get connection to Fire Station 8, but failed. Looks like the landfill is just too high now.
  • Repointed dish at Mount Allison for alternate path.
    • Observer 10GHz beacon at Mt Allison on radio's spectrum analyzer
January 2024 / 3
  • Added 10 GHz Mimosa dish on roof, pointing at Fire Station 8
    • Connection could not be made. The other end is not yet aligned. It's also possible the link is non-viable as the "tip" near the Bay may be too high now and obstructing.

January 2024 / 2

  • Installed KVM
  • Labelled newly installed cables
  • Terminated and installed roof ethernet
    • Cable has been pulled to the roof by HE.

January 2024 / 1

  • Installed 1G and 10G optics for later use

December 2023 / 3

  • Setup peering with ARIX on 1G optics

December 2023 / 2

  • Installed new PDU
  • Removed Media Converter
  • Installed Mikrotik CRS309-1G-8S+IN Switch to support multiple incoming fibers
  • Configured BGP
  • Configured OSPF
  • Configured Wireguard to Oxford as temporary link until dish installed
  • Switched FCIX optics to 10G
  • Installed HE fiber in 1G optics on switch

December 2023 / 1

  • Installed Router
  • Installed Proxmox Server
  • Installed SFP Media Converter
  • Attached HE fiber to Router

Contacts

Site Admin

  • Tim Wilkinson - KN6PLV - tim@bayareamesh.us

Mesh Admin

  • Tim Wilkinson - KN6PLV - tim@bayareamesh.us