BAM Weekly Working Group October 24th, 2022

From Bay Area Mesh
Revision as of 14:40, 24 October 2022 by Kn6plv (talk | contribs) (→‎Major Discussions Topics[edit | edit source])
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Attendees

  • Dave Dornlas
  • Chris Adams
  • Tim Wilkinson

Notes by

  • Tim Wilkinson

Major Discussions Topics

  • High Sites
    • San Bruno Mountain
      • Submitting plan for new hardware mounting
    • Woflback
      • Tests from ORCA and CCCC successful. San Pedro is the last.
    • Sunol Ridge
      • Livermore have a repeater here. Tim is visiting in early November
  • Alameda OES
    • Chris talked about possible paths available for the OES project with Alameda County
    • Possibilities of a test link (2 sites)
  • Las Positas College
    • Dave discussed how we might get access, and creating some sort of standard letter to send to possible sites as way of introduction.