BAM Weekly Working Group January 23rd, 2023

From Bay Area Mesh
Revision as of 13:46, 23 January 2023 by Kn6plv (talk | contribs) (Created page with " === Attendees === * Mathison Ott * Dave Dornlas * Christiaan Adams * Tim Wilkinson === Notes by === * Tim Wilkinson === Major Discussions Topics === * ORCA ** Report on the MAJOR weekend work at ORCA to remove and reinstall an underground power feed. Amazing work by Chris, Mathison and the ORCA club. ** Still work to do there, including tree trimming and ORCA antenna changes ** Plan to still upgrade the AREDN nodes onsite, possibly as part of the antenna changes wh...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Attendees

  • Mathison Ott
  • Dave Dornlas
  • Christiaan Adams
  • Tim Wilkinson

Notes by

  • Tim Wilkinson

Major Discussions Topics

  • ORCA
    • Report on the MAJOR weekend work at ORCA to remove and reinstall an underground power feed. Amazing work by Chris, Mathison and the ORCA club.
    • Still work to do there, including tree trimming and ORCA antenna changes
    • Plan to still upgrade the AREDN nodes onsite, possibly as part of the antenna changes which will require a cherry picker or similar rented construction equipment.
  • Chabot
    • Camera restored, but probably still a good idea to replace it.
  • Sunol Ridge
    • Still plan to install Feb 4th.
  • San Bruno Mountain
    • Look at the option of adding a PTZ camera.