BAM Weekly Working Group June 12th, 2023

From Bay Area Mesh
Revision as of 16:40, 17 June 2023 by Kn6plv (talk | contribs) (Created page with "=== Attendees === * Dave Dornlas * Jim Moss * Tim Wilkinson * Mathison Ott * Chris Adams === Notes by === * Tim Wilkinson === Major Discussions Topics === * Black Mountain ** Jim continues to work on debugging the problems at Black Mountain. ** Discussion that at some point it might be useful to take a bunch of equipment out into the desert to do some non-interference, distance testing between nodes (Mathison has always wanted to do this). * Jim ** Giving a presenta...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Attendees

  • Dave Dornlas
  • Jim Moss
  • Tim Wilkinson
  • Mathison Ott
  • Chris Adams

Notes by

  • Tim Wilkinson

Major Discussions Topics

  • Black Mountain
    • Jim continues to work on debugging the problems at Black Mountain.
    • Discussion that at some point it might be useful to take a bunch of equipment out into the desert to do some non-interference, distance testing between nodes (Mathison has always wanted to do this).
  • Jim
    • Giving a presentation on AREDN in the South Bay on Tuesday
    • Tim will help him configure the new switch for Black next week
    • Invited to Allison to see what we can/cannot arrange there
  • Winlink
    • Dave is working on a Winlink system, but progress and debugging on the non-Window software is slow going.