Attendees
- John Swallow
- Jim Moss
- Tim Wilkinson
- Mathison Ott
- Chris
Notes by
- Tim Wilkinson
Major Discussions Topics
- Release 3.24.4.0 planned for this week
- Go/no go call to be made on Tuesday
- City Hall
- Omni has been repositioned on the top of the tower
- Reception is *much* better now
- Sweeney Ridge connection is reported as slower then expected
- Someone needs to diagnose the issue
- Omni has been repositioned on the top of the tower
- Kaiser
- Dave has a connection with someone at the hospital about putting a node there
- Will follow up in email and hand off to Tim
- SFWEM update
- Now legal case has been dismissed, operations will be closed down
- Role will be taken by BAM now
- CCCC
- New 3X airFiber radio installed
- Mt Diablo North
- UPS power there failed and needs to be replaced
- Drill
- Dave is planning to run a drill to see if a mobile node can transmit a picture to the EOC
- ORCA
- Oakland is planning an emergency exercise
- Comms only (no mesh)