Attendees

  • John Swallow
  • Jim Moss
  • Tim Wilkinson
  • Mathison Ott
  • Christiaan Adams

Notes by

  • Tim Wilkinson

Major Discussions Topics

  • Release 3.24.4.0 planned for this week
    • Go/no go call to be made on Tuesday
  • City Hall
    • Omni has been repositioned on the top of the tower
      • Reception is *much* better now
    • Sweeney Ridge connection is reported as slower then expected
      • Someone needs to diagnose the issue
  • Kaiser
    • Dave has a connection with someone at the hospital about putting a node there
    • Will follow up in email and hand off to Tim
  • SFWEM update
    • Now legal case has been dismissed, operations will be closed down
    • Role will be taken by BAM now
  • CCCC
    • New 3X airFiber radio installed
  • Mt Diablo North
    • UPS power there failed and needs to be replaced
  • Drill
    • Dave is planning to run a drill to see if a mobile node can transmit a picture to the EOC
  • ORCA
    • Oakland is planning an emergency exercise
    • Comms only (no mesh)