Hurricane Electric FMT2

From Bay Area Mesh
Revision as of 17:47, 8 December 2024 by Kn6plv (talk | contribs)
Jump to navigation Jump to search
Hurricane Electric Colocation Facility Fremont2.jpg

he.net

Hurricane Electric is located at 48233 Warm Springs Blvd, Fremont, CA 94539 (map)(photos).

Part of the Bay Area Backbone.

Configuration

https://netbox.bayareabackbone.com/dcim/sites/1/

Nodes

Hurricane Rack.jpg

KN6PLV-HE-VERA

  • Radio: Proxmox
  • Antenna: -
  • Location: 37.4718, -121.9201
  • Altitude: -
  • Bearing: -
  • Notes: Node is virtualized

KN6PLV-BAM-SUPERNODE

  • Radio: Proxmox
  • Antenna: -
  • Location: 37.4718, -121.9201
  • Altitude: -
  • Bearing: -
  • Notes: Node is virtualized

Backbone

To Mnt Allison.jpg

Dish to Mount Allison

  • Radio: Mimosa B11
  • Link Name: hurricane-to-allison
  • Frequency: 10.010 GHz & 10.030 GHz
  • Bandwidth: 2x 20 MHz
  • Mode: AP
  • Antenna: 34 dBi dish - Jirous JRMC-680-10/11
  • Location: 37.4718, -121.9201
  • Altitude: 14m
  • Bearing: 53°

Site Details

Hurricane Electric Fremont 2 is a 208,000 square foot colocation facility located in the heart of Silicon Valley with easy access from two major freeways (880, 680). Three international airports (SJC, OAK, SFO) are a short distance away. Their Fremont 1 Colocation Facility is located 1.5 miles north (edited from their website).

More information can be found on their website.

Colocation

Cabinet

  • Cabinet: fmt2.1500.06.51
  • CE Number: ce4794
  • Power Type: 20A, 208V, single-phase

Router

  • Manufacturer: Mikrotik
  • Model: RB5009UPr+S+

Switch

Server

  • Manufacturer: Intel
  • Model: NUC11ATKC4 16GB+512GB
  • OS: Proxmox

Port Configurations

VLANs
VLAN Description
2 AREDN DtD
10 AREDN LAN
11 AREDN WAN
408 bam-uisp @ 206.197.44.8
409 websites proxy @ 206.197.44.9
410 aredn-supernode @ 206.197.44.10
1101 xlink & OSPF networks
4001 Switch management
4002 Switch sfp+2 port
4003 Switch sfp+3 port
4004 Switch sfp+4 port
4005 FREMIX (switch sfp+5 port)
4006 ARIX (switch sfp+6 port)
4007 FCIX (switch sfp+7 port)
4008 Hurricane Electric (switch sfp+8 port)
Router
Port Description VLANs PoE Notes
sfp+ to Switch 4001,4002,4003,4004,4005,4006,4007,4008 - 10G DAC connection to switch
2.5g no
2 no
3 no
4 no
5 no
6 Proxmox Server (U), 408, 409, 410,1101 no
7 KVM 48v
8 10 GHz dish 1101 48v
Switch
Port Description VLANs PoE Notes
sfp+1 to Router 4001,4002,4003,4004,4005,4006,4007,4008 - 10G DAC connection to router
sfp+2 (4002) -
sfp+3 (4003) -
sfp+4 (4004) -
sfp+5 FREMIX (4005) - 10G
sfp+6 ARIX (4006) - 1G
sfp+7 FCIX (4007) - 10G
sfp+8 Hurricane Electric (4008) - 1G: Transit provider
eth -
Transit Information

This site provides a peering point between the Backbone and the more general Internet.

  • IPv4 Peer
    • BAM: 65.49.70.251/31
    • HE: 65.49.70.250/31
    • Network: 65.49.70.250/31
  • IPv6 Peer
    • BAM: 2001:470:253::2/126

HE: 2001:470:253::1/126

    • Network: 2001:470:253::1/126

Future Plans

None

Completed Work

April 2024

  • Re-adjust antenna once Mount Allison dish is installed.
  • Replace missing radio bolt.

March 2024 / 2

  • Adjust dish positioning to improve SNR.

March 2024 / 1

  • Replace Mimosa power solution with injector + power controller (ezOutlet5)
    • The B11 radio required more power (just occasionally) than the router could provide, causing resets.
February 2024
  • Adjusted and raised dish to try to get connection to Fire Station 8, but failed. Looks like the landfill is just too high now.
  • Repointed dish at Mount Allison for alternate path.
    • Observer 10GHz beacon at Mt Allison on radio's spectrum analyzer
January 2024 / 3
  • Added 10 GHz Mimosa dish on roof, pointing at Fire Station 8
    • Connection could not be made. The other end is not yet aligned. It's also possible the link is non-viable as the "tip" near the Bay may be too high now and obstructing.

January 2024 / 2

  • Installed KVM
  • Labelled newly installed cables
  • Terminated and installed roof ethernet
    • Cable has been pulled to the roof by HE.

January 2024 / 1

  • Installed 1G and 10G optics for later use

December 2023 / 3

  • Setup peering with ARIX on 1G optics

December 2023 / 2

  • Installed new PDU
  • Removed Media Converter
  • Installed Mikrotik CRS309-1G-8S+IN Switch to support multiple incoming fibers
  • Configured BGP
  • Configured OSPF
  • Configured Wireguard to Oxford as temporary link until dish installed
  • Switched FCIX optics to 10G
  • Installed HE fiber in 1G optics on switch

December 2023 / 1

  • Installed Router
  • Installed Proxmox Server
  • Installed SFP Media Converter
  • Attached HE fiber to Router

Contacts

Site Admin

  • Tim Wilkinson - KN6PLV - tim@bayareamesh.us

Mesh Admin

  • Tim Wilkinson - KN6PLV - tim@bayareamesh.us