BAM Weekly Working Group December 19th, 2022

From Bay Area Mesh
Jump to navigation Jump to search

Attendees

  • Mathison Ott
  • John Swallow
  • Rob Rowlands
  • Tim Wilkinson

Notes by

  • Tim Wilkinson

Major Discussions Topics

  • Status on AREDN 3.22.12.0
    • About 40% adoption on SFWEM
    • Only one noted failure of a node to update (top of a tower!) which can hopefully be fixed.
  • NBAM
    • Rob gave a brief end-of-year summary of the NBAM network expansion.
    • Discussed about pending install at ORCA for a solid connection to Wolfback.
  • Moon Mountain
    • John handed off info about potential site at Ty Caton Vineyard, Moon Mountain to Rob.
  • Sunol Update
    • Sunol visit happened!
    • First proposal of a 3 radio install - two sectors for Livermore and Fremont, and a dish to connect to the backbone at San Carlos
    • Plan to first install the San Carlos dish pointing to Sunol Ridge.