BAM Weekly Working Group December 4th, 2023

From Bay Area Mesh
Jump to navigation Jump to search

Attendees

  • Christiaan Adams
  • Tim Wilkinson
  • Jim Moss
  • Dave Dornlas
  • John Swallow
  • Mathison Ott

Notes by

  • Tim Wilkinson

Major Discussions Topics

  • MeshChat
    • Chris: Latest check-in saw the same number of people as last time
    • Some notable sync issues between clients, probably because firmware updates remove the mesh chat api piece
    • Accidental connection of local Mesh with Oregon mesh caused mesh chat overload
      • Not clear how to prevent this or fix it afterward
    • 4 Winlink checkins
  • Release
    • Happening today (update - didnt happen)
  • Link to San Pedro
    • Plan to add a new backbone link between San Bruno Mtn and San Pedro
    • SBM4 piece installed this week (Wednesday, weather permitting)
    • San Pedro piece next week
  • Mt Diablo
    • Some virtual tidying is planned through the end of the year
    • Some physical tidying is planned for next year
  • Ames Radio Club
    • John is working with them on installing nodes and options looking towards Umunhum
  • Half Moon Bay
  • Zim
    • Chris is build a wiki site hosting compressed verisons of Wikipedia, etc.