BAM Weekly Working Group December 4th, 2023
Jump to navigation
Jump to search
Attendees
- Christiaan Adams
- Tim Wilkinson
- Jim Moss
- Dave Dornlas
- John Swallow
- Mathison Ott
Notes by
- Tim Wilkinson
Major Discussions Topics
- MeshChat
- Chris: Latest check-in saw the same number of people as last time
- Some notable sync issues between clients, probably because firmware updates remove the mesh chat api piece
- Accidental connection of local Mesh with Oregon mesh caused mesh chat overload
- Not clear how to prevent this or fix it afterward
- 4 Winlink checkins
- Release
- Happening today (update - didnt happen)
- Link to San Pedro
- Plan to add a new backbone link between San Bruno Mtn and San Pedro
- SBM4 piece installed this week (Wednesday, weather permitting)
- San Pedro piece next week
- Mt Diablo
- Some virtual tidying is planned through the end of the year
- Some physical tidying is planned for next year
- Ames Radio Club
- John is working with them on installing nodes and options looking towards Umunhum
- Half Moon Bay
- Have an ambition plan for new connectivity - https://www.hmbarc.org/training-events/aredn
- Zim
- Chris is build a wiki site hosting compressed verisons of Wikipedia, etc.