BAM Weekly Working Group February 27th, 2023

From Bay Area Mesh
Jump to navigation Jump to search

Attendees

  • John Swallow
  • Mathison Ott
  • Dave Dornlas
  • Christiaan Adams
  • Tim Wilkinson

Notes by

  • Tim Wilkinson

Major Discussions Topics

  • San Carlos
    • Mark (site owner) replace the old hAP lite with the new hAP ac2.
    • Measurably better throughput at the site.
  • Swallow Home
    • John is working to add a dish to the backbone (weather permitting)
  • Mnt Vaca
    • Discussions about getting Mnt Vaca (and nodes connected to it) connected to the mesh without tunnels
    • No conclusions on how to proceed
  • Firestation 41
    • 531 Obispo Rd, El Granada
    • Possible site but unclear how to connect to the rest of the mesh
  • Migrating #sfwem to new Slack workspace
    • Discussed motivation and time table