BAM Weekly Working Group January 29th, 2024

From Bay Area Mesh
Jump to navigation Jump to search

Attendees

  • Christiaan Adams
  • Tim Wilkinson
  • Jim Moss
  • Dave Dornlas
  • Mathison Ott

Notes by

  • Tim Wilkinson

Major Discussions Topics

  • John Cornell's nodes
    • New cable installed between Fish Ranch and John's nodes. A long requested connection finally in place.
  • Sugar Hill
    • Discussion about connecting Sugar Hill (near Fairfield)
    • Trevor talking to people
    • Tim will chat with the NBAM folk to look at that option.
  • Evans Hall
    • Mathison plans to upgrade the batteries soon
    • Change out 2.4 dish as no one uses it
  • RatPack
    • Mathison pointed everyone at a new talk given by Orv which includes some updated information.
  • Hurricane Electric
    • HE dish is up and pointed at FS8, but no connection yet
    • Plan to visit FS8 to repoint
  • PAARC
    • PAARC (San Jose) are interested in hosting some AREDN nodes at their site at Eagle's Peak
    • Work with them, via Jim, to help that happen
  • Discussions about the next net checking