BAM Weekly Working Group December 19th, 2022
Jump to navigation
Jump to search
Attendees
- Mathison Ott
- John Swallow
- Rob Rowlands
- Tim Wilkinson
Notes by
- Tim Wilkinson
Major Discussions Topics
- Status on AREDN 3.22.12.0
- About 40% adoption on SFWEM
- Only one noted failure of a node to update (top of a tower!) which can hopefully be fixed.
- NBAM
- Rob gave a brief end-of-year summary of the NBAM network expansion.
- Discussed about pending install at ORCA for a solid connection to Wolfback.
- Moon Mountain
- John handed off info about potential site at Ty Caton Vineyard, Moon Mountain to Rob.
- Sunol Update
- Sunol visit happened!
- First proposal of a 3 radio install - two sectors for Livermore and Fremont, and a dish to connect to the backbone at San Carlos
- Plan to first install the San Carlos dish pointing to Sunol Ridge.