BAM Weekly Working Group December 19th, 2022

From Bay Area Mesh
Revision as of 12:55, 19 December 2022 by Kn6plv (talk | contribs) (Created page with " === Attendees === * Mathison Ott * John Swallow * Rob Rowlands * Tim Wilkinson === Notes by === * Tim Wilkinson === Major Discussions Topics === * Status on AREDN 3.22.12.0 ** About 40% adoption on SFWEM ** Only one noted failure of a node to update (top of a tower!) which can hopefully be fixed. * NBAM ** Rob gave a brief end-of-year summary of the NBAM network expansion. ** Discussed about pending install at ORCA for a solid connection to Wolfback. * Moon Mountai...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Attendees

  • Mathison Ott
  • John Swallow
  • Rob Rowlands
  • Tim Wilkinson

Notes by

  • Tim Wilkinson

Major Discussions Topics

  • Status on AREDN 3.22.12.0
    • About 40% adoption on SFWEM
    • Only one noted failure of a node to update (top of a tower!) which can hopefully be fixed.
  • NBAM
    • Rob gave a brief end-of-year summary of the NBAM network expansion.
    • Discussed about pending install at ORCA for a solid connection to Wolfback.
  • Moon Mountain
    • John handed off info about potential site at Ty Caton Vineyard, Moon Mountain to Rob.
  • Sunol Update
    • Sunol visit happened!
    • First proposal of a 3 radio install - two sectors for Livermore and Fremont, and a dish to connect to the backbone at San Carlos
    • Plan to first install the San Carlos dish pointing to Sunol Ridge.