BAM Weekly Working Group February 27th, 2023
Jump to navigation
Jump to search
Attendees
- John Swallow
- Mathison Ott
- Dave Dornlas
- Christiaan Adams
- Tim Wilkinson
Notes by
- Tim Wilkinson
Major Discussions Topics
- San Carlos
- Mark (site owner) replace the old hAP lite with the new hAP ac2.
- Measurably better throughput at the site.
- Swallow Home
- John is working to add a dish to the backbone (weather permitting)
- Mnt Vaca
- Discussions about getting Mnt Vaca (and nodes connected to it) connected to the mesh without tunnels
- No conclusions on how to proceed
- Firestation 41
- 531 Obispo Rd, El Granada
- Possible site but unclear how to connect to the rest of the mesh
- Migrating #sfwem to new Slack workspace
- Discussed motivation and time table