BAM Weekly Working Group Sept 11th, 2023
Jump to navigation
Jump to search
Attendees
- Joh Swallow
- Dave Dornlas
- Mathison Ott
- Christiaan Adams
- Tim Wilkinson
- Jim Moss
Notes by
- Tim Wilkinson
Major Discussions Topics
- Drone Truck
- Dave discuss a drone truck owned by Meno Park and whether adding AREDN there would be useful as a backup comms system for drone video streaming or upload.
- Chabot
- Tim updated on equipment removal from Chabot and proposed reinstall in Q1 2024 once they finish the new roof.
- Sunol Peak
- Tim updated on Sunol changes. New mounting for old 5GHz dish plus added a 60GHz dish pointing at Mt Allison.
- Black
- Jim reports the 60GHz link between the two sites is down. Not yet clear why.
- Mt Diablo
- Link instability reported.
- Mathison plans a visit to see if it can be fixed.
- Some discussion about link from Diablo to ORCA - Chris reckons one cut down tree will open a path.
- Pacificon
- Trifold
- ~150 left, which may not be enough (original order was 500)
- Update and make some more
- Posters
- Make a new poster showing the state of the mesh today
- Update the equipment poster to remove old devices and add the new ones we recommend
- Tim to follow up with new equipment suggestions
- Use cases
- Find a way to show off use cases at the table
- Answer the "what is this for" question
- Trifold
- General Mesh Use
- Chris wants to introduce something which we, as a group, regularly us the mesh for.
- Suggestions:
- A photo contest
- VoIP weekly net
- Winlink checkin
- Some other form of weekly get to gether
- Chris suggested it should be asynchronous, so people have a window of time to participate
- Some for of MeshChat checkin is an option